亚洲日本VA一区二区三区,伊人情人色综合网站,黄A大片AV永久免费,黑人又粗又大XXX精品

Welcome to Ningbo Fenghua Yongqiang Filtration Equipment Co., Ltd!

中文 | EN | Sitemap | RSS | XML

National free hotline

86-15958872291

Your current location : Home >> News >> Company news

Contact UsContact Us

Ningbo Fenghua Yongqiang Filtration Equipment Co.,

Mob:86-15958872291

E-mail:yqglqc001@126.com

Add:Block 7-1, No.299, Siming East Road, Jiangkou street, Fenghua District, Ningbo City

Website:yongljia.com

What are the advantages of waste water control for plastic muffler

2020-09-15 18:58:41
Times

The environmental protection specialty of muffler structure in the project proposal should include the following main contents: the environmental status of the area; possible environmental impact and preventive measures; opinions and requirements of local environmental protection department; existing problems. The environmental protection specialty in the feasibility study report should include the following main contents: (1) the environmental status of the proposed project area; the ecological changes that may be caused by the project construction; the environmental protection standards adopted in the design; the main pollution sources and pollutants of the construction project; the preliminary plan for controlling pollution and ecological changes; and the nursing major should include the following main contents: the environmental status of the construction area Environmental capacity of the project construction area; main pollution sources and pollutants of the construction project; environmental protection policies and standards implemented by the national and local governments; environmental management measures and expected effects; brief description of the impact of engineering construction on ecological and cultural heritage and protection measures; main pollution sources and environmental protection measures of muffler automobile construction project; influence of environmental protection report It is suggested to prepare environmental protection report. The environmental protection chapter (special chapter) of the preliminary design or basic design shall include the following main internal preparation basis; environmental protection laws and standards for design implementation; project overview; characteristic parameters such as types, composition, quantity, emission law, discharge mode, destination, temperature and pressure of main pollution sources and pollutants; comprehensive utilization and treatment measures adopted in the design and expected effect; and; The total amount control of pollutants; greening scheme; environmental protection management organization and personnel; environmental monitoring institutions, facilities and personnel; environmental investment estimation; problems and solutions of automobile muffler. The construction drawings shall be carried out according to the contents and requirements specified in the environmental protection chapter (special chapter) and the contents and requirements of the environmental impact report approved by the environmental protection department.

廢水防治對于塑料消聲器有哪些好處


label

contact us

Ningbo Fenghua Yongqiang Filtration Equipment Co.,

Add:Block 7-1, No.299, Siming East Road, Jiangkou street, Fenghua District, Ningbo

E-mail:yqglqc001@126.com

Mob:86-15958872291

contact us

銅燒結(jié)消聲器

SERVICE

Contact:Eunice

86-15958872291


24-hour hotline
盐边县| 惠水县| 疏附县| 犍为县| 宜昌市| 小金县| 义马市| 柯坪县| 泸州市| 建宁县|